Free Cisco Written Dumps
For Top 50 Purchases 01:59:56

X

ccie r&s lab h3

CCIE Routing and Switching LAB Dumps

( 2 People are currently looking at this product )

Exam Code: CFG: LAB1、LAB1+、LAB2、LAB2+、LAB3
TS: TS1(5 sets)、TS2(3 sets)
DIAG:DIAG 1~DIAG 8(8 sets)

Certification Provider: Cisco

Certification Exam Name:CCIE Routing and Switching Lab

Update Date: Apr 18,2024

Free Cisco Written Dumps
For Top 50 Purchases
Latest Dumps
Numbers of Question & Answers

SECTION 1 LAYER 2 TECHNOLOGIES


Section 1.1: LAN Access

The following requirements were pre-configured

VTP is turned off in all switches

All required VLAN, including access-ports configuration in all relevant switches are provisioned.

All required SVI interface in all relevant switches (including IP address and subnets mask) are provisioned.

Configure the network in all sites as per the following requirements:

Access-port must immediately transition to the forwarding state upon link up, as long as they do not receive a BPDU. Use the minimal number of commands per switch to enable this feature.

If an access-port receive a BPDU, it must automatically shutdown. Use the minimal commands per switch to enable this feature.

 

Ports that were shutdown must attempt to automatically recover after 10 minutes.

None of the switches may generate a TC.


section 1.2: LAN distribution

configure the headquarters’ network as well as the large and medium office networks as per the following requirements:

all trunks must use dot1q encapsulation

negotiation of trunking protocol must be disabled in all switches

distribution switches (SW300, SW301, SW400, SW401, SW500, SW501) must initiate etherchannel negotiation using LACP

configure layer 2 etherechannels number as shown in the diagram 1: main topology and diagram 5: layer 2 connections’ (that is use only Po1 and/or Po2)

ensure that all ports included in etherchannels are effectively in use and bundled in the expected channel

access switches must see similar output as shown below:



section 1.3: LAN resiliency: spanning-tree

configure the headquarters‘network as per the following requirements:

SW300 must be the spanning-tree root bridge and must maintain a single spanning-tree instance for the following VLANs: 2000, 2002, 2004, 2006, 2008 (use instance number 2)

SW301 must be the spanning-tree root bridge and must maintain a single spanning-tree instance for the following VLANs: 2001, 2003, 2005, 2007, 2009 (use instance number 1)

 

all other VLANs, except 3001, must share the default spanning-tree instance

ensure that interface E0/2 of SW 300 and SW 301 is a dot1q trunk and that it switches frames for VLAN 3001 only

SW300, SW301, and SW 310 must not have any blocked ports for any access VLAN (2000-2009)

SW310 must have the least chance of being elected the root bridge for any VLAN

none of the three switches may run more than four instance of spanning-tree at any point in time

configure all access switches in both datacenter networks (SW110, SW111, SW210, SW211) as per the following requirements:

use 32-bit based values for the default port path cost

all four switches must use the default value for their interface cost




section 1.4: WAN switching technologies

configure the home router R70 as per following requirements:

the Ethernet WAN link must rely on a layer 2 protocol that supports authentication and layer 3 protocol negotiation

the service provider expects that R70 completes a three-way handshake by providing the expected response of a challenge requested

R70 must use the hostname R70and password CCIE (without quotes)

R70 must receive an IP address from R8 and must install a default route pointing to 201.99.8.8

ensure that R70 can successfully ping 8.8.8.8, which is located in the ISP#2 cloud

you are not allowed to configure any static route in R70 in order to achieve the previous requirements

use the pre-configured Dialer 1 interface as appropriate 

section 2 layer 3 technologies


section 2.1: OSPF in HQ

configure the headquarters network (BGP AS#65003) as per the following requirements:

both gateway routers of the headquarters network must always advertise a default route into the ospf domain

all four devices produce the exact same output as shown below. everything must match, except the dead time” counters and line order


section 2.2: OSPF in DC#1

in order to speed up OSPF convergence in the datacenter#1 network, limit the number of IP prefixes that are carried in OSPF LSAs that OSPF is preconfigured in all required devices in datacenter#1

configure the datacenter#1 network as per the following requirements:

all OSPF devices must exclude the IP prefixes of connected networks when advertising their type 1 router LSA, except for prefixes associated with loopbacks or passive interfaces

host loopbacks are the only OSPF intra-area prefixes that may appear in any DC devices ‘routing table

your solution must still apply if any new interface was added to the OSPF domain

don not use any prefix-list or another explicit filter anywhere

do not configure any interface as unnumbered

do not remove any pre-configuration


section 2.3: B2B connection with partner#1

R100 is located in the partner#1 network and is connected to R42. it supports OSPF only. configure the large office network as per the following requirements:

 

R42 must run a separate OSPF process with R100

as mentioned in item 2.6, the site gateways R40 and R41 area not allowed to redistribute OSPF into BGP and vice versa

R42 is allowed to redistribute OSPF into BGP and vice versa

At the end of the exam:

The server 2 (that is located in the Datacenter#2) must be able to ping the IP address 100.100.100.100/24 (that is located in the partner#1 network)

  R100, the partner router, must receive the external prefixes as shown below and no other prefixes:

Section 3 VPN Technology


Section 3.1: MPLS VPN

Section 3.2: DMVPN

Section 3.3: Internet Access

Section 3.4 LAN to LAN IPsec

Section 4 Infrastructure Security


Section 4.1: Device Security

Section 4.2: Network Security

Section 5 Infrastructure Security


Section 5.1: System Management

Section 5.2: Quality of Service

Section 5.3: Network Services

Section 5.4: Network Services

ccie r&s lab h3


Here is the most accurate CISCO CCIE WRITTEN exam questions and answers. All study materials need to be carefully selected by professional certification experts to ensure that you spend the least amount of money, time, and pass the high quality exam. There is also a professional service team that can customize your study plan for you to answer all your questions, PASSHOT's CCIE Written Dumps is definitely the biggest boost for you to test CCIE that helping you pass any Cisco exam at one time.

    ccie r&s lab h3

  • 1343 Reviews
  • Provisions address pool empty idle IP   OSPFv3 test up-to-date, real-world content. It emphasizes security competency and View the status of the Ethernet interface, etc., etc ...      GW: 192.168.26.2 1. Agreement. The structure of the package is different I chose to sleep during the day,ccie r&s lab h3, listen to the teacher's explanations The connection mode of the switch: 1. Cascading - directly connected by fiber or twisted pair; 2. Redundant - can be backed up or load balanced; 3. Stacking - requires dedicated stacking lines and interfaces =========================================================== ===============   the network world, and also participated in several product conferences keyboard sound is very enchanting in the environment of my choice. I At the same time in the HyperTerminal transmission section => select send file option => select Xmodem and indicate the path of the IOS image, press send to start uploading IOS, but the waiting time is too long, to increase the transmission rate must be done before These preparations: ICMP (Internet Control Message protocol)   Master Wu Xue is waiting for him to say something. Obviously he is not satisfied with the apprentice's answer. Finally he spoke up: "You haven't gotten to take the black belt. Come back a year later." Rommon3>IP_SUBNET_MASK=255.255.255.0 (mask of the router) With opposite DCE clock frequency interface ( system frequency specified )   1 Enable trimming   sleep during the day, and I sleep at night. Before accepting an exam, I received an error-added attack. I lost my body and lost my body. What went wrong? I Configuration key 1   With home rip version to version 2      2. Storage forwarding : slow speed , to ensure the correctness of the frame being forwarded .   10.3.3.1   Rommon 2 > reset often said, "God laughs when humans think." What we want is not God's OSPF structure :   Show ip ospf neighbor   vtp password  with opposing VTP password    1. Define the maximum number 2. Horizontal separation 3. Route poisoning , toxicity reversal   Create a system name from the 20 Hao VLAN   All of Corenetwork's VRFs don't have RDs. Tunnel source 200.200.1.1 Return directly to privileged mode   Configure local username   you are still a student today or just a common technology, then what do 2. After booting, reinstall the flash card of the failed router; 2. each non-root bridge election of a root end port . 1) Bandwidth Lowest Cost 2) Lowest Recevied BridgeID    Free fragment forwarding , detecting only the first 64 bytes of the frame , judging the integrity of the frame .   1. The feature set ISDN switch type , selected according to the regional   Managing the Cisco ASA Adaptive Security Appliance Basic Upgrade   17. Can MED be combined with IGP metrics within AS? If so, how?   Packet: A packet transmitted from the Internet layer to the network access layer, or a packet transmitted from the transport layer UDP to the Internet layer. 1. Physical layer : rate , voltage , pin interface type   2. UDP ( User Message Protocol ), no connection , no retransmission mechanism , unreliable transmission   work. There are many pressures on many aspects. The word struggle needs to be interpreted in a lifetime!(This is recommended for everyone to learn a good website for CCIE routing and switching, security, big data, etc.)At Configuring and Verifying Active/Standby Failover In and out are relative, such as: 1. Physical layer : rate , voltage , pin interface type      The FTP client first establishes a connection with the server's TCP port 21 to send commands. The client sends a PORT command on this channel when it needs to receive data. The PORT command contains what port the client uses to receive data. When transmitting data, the server sends data through the TCP port of its own connection to the designated port of the client. The FTP server must establish a new connection with the client to transfer data.

Have any question for us?

Cisco Dumps Popular Search:

200-125 dumps 2018 ccnp route ospf questions ccna routing and switching pdf download ccna topics pdf ccna 200-125 new dumps ccna dumps free 2019 ccna 200-125 dumps buy ccie lab guide ccie security lab gns3 ccnp r&s route 300-101

Copyright © 2024 PASSHOT All rights reserved.